Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

County of Orange (FL)

Florida Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL

2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL

2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING

2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS

2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION

2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING

2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY

2023 8TH EDITION FLORIDA FIRE PREVENTION CODE 

NFPA 70

2020 NATIONAL ELECTRIC CODE 

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Ee Stamp Notes

Digitally Verified Signature

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
145
Wind Notes

Exposure Category C ; HVHZ

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

PE Instructions:

PV Plans PDF must be flat / no layers, before stamping.

PE digital stamp on all PV Plan pages 1-7a, FL Statute, PE Letter & Calcs.

SEPARATE stamped pages

Organize the separated stamped plans pages and the unstamped plans pages into a ZIP folder to use as the Completed Plans.

Digitally Verified Signature

Split plans

This AHJ requires splitting the plans

Electrical

Electrical Load Calcs Required
Derates,MPUs
Allowed POI
PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
75
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

No published information about battery placement.

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Plans need to be flattened in adobe before submitting to engineering.

To flatten plans in CAD:

Use the FLATTEN command to change the Z values of all lines, arcs, and polylines to 0.

  1. Turn off or freeze any hatch layers with hatch patterns so they are not included in the selection.
  2. Type FLATTEN at the command line.
  3. Select all objects and press the Enter key.
  4. Type N for No when prompted to remove hidden lines.
  • Plans cannot have layers, and all pages must be signed and sealed. Spec sheets must be uploaded with each page as a separate file.
  • Ensure that spec sheets are uploaded along with the plan set.

#NFZ_all#

#NFZ_ALL#

Cover Page Notes

All Jobs [Wind speed: 145mph]

Roof Plan

Add a photo of the attic framing to the roof plan.


Attachment Detail

BLOCKIN NOT ALLOWED!!

  • UTILIZE DECK MOUNT AS ALTERNATIVE
Electrical Diagram

MPU/Derate

  • Fill out the MPU derate response in the Files section.

Single Line Diagram to be included.

Batteries Only: Panel schedule required.

NEC 310.15(c)(1):

  • More than 9 current-carrying conductors in one conduit requires a 50% derate.

For Load Side Taps:

  • Wire size from AC disco to tap must not be less than the rating of the equipment containing an overcurrent device(s) supplied by the tap conductors or not less than the rating of the overcurrent protective device at the termination of the tap conductors.
  • i.e. #3/0 for 200A and #1/0 for 150A (8/12/25)
Electrical Diagram Notes

LST [PER NEC 240.21(B)(1), tap conductors must be rated to the overcurrent protective device at the termination of the tap conductors]

Label Page

FLORIDA 2020 LABEL

Custom Placards Required
0
Placards Notes

Rapid shut down sticker is required to be posted on AC disconnect. All Values on Placards have to be from a label maker, sharpie values are not accepted.

Non Standard Revision Requirements

All revised plans must have clouding over the revised items or the permit will be rejected outright.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

The zoning department confirmed we cannot build structures in the front yard. 

  • The maximum Height of Solar Panels shall be 8 feet
  • Free-standing or ground-mounted solar panels shall be shielded by an opaque fence or wall between 6 feet and 8 feet in height
  • A minimum building set back shall be 5 feet from cyan rear property lines.
  • In residential areas, the square footage of solar panels shall not exceed 25% of the living area of the principal structures, and such square footage shall not count towards the allowed square footage for other accessory structures.
  • Solar panels shall be located only in a side or rear yard
  • SitePlan.pdf) to include: dimensions for proposed solar array matching dimensionalized plan, setbacks from property lines to proposed solar array, and statement "This does not constitute a survey".
Setback Back Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Orange (FL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.