County of Pinellas (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- Storage Systems,MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
FL statute
Digitally Verified Signature
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 145
- Wind Notes
Exposure Category C
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
PE letter/PE calcs
Digitally Verified Signature
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates,Load Relocation
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
702.4 Guidance
- AHJ Enforcing NEC 702.4 (Optional Standby Systems) for ESS Will require us to only backup essential loads whose total demand does not exceed what the # of Batteries can provide E.g., 1x Tesla PW can export 20.8A, and so the total load demand in backup cannot exceed 20.8A as shown on planset load calculations (standard and optional acceptable).
- Option 1: 702.4(B) EMS or Load Management Hardware Exception can be used in NEC 2020/2023 as to allow maximum capable backup loads (I.E.-SPAN).
- Option 2: 220.87(1) Exception: Load Calculation based on Utility Meter Demand Data (Green Button - 15 min Interval over a 30 day period.)
- Option 3: Load Calculations via Emporia Energy Monitoring (30 Day Period)
- Option 4: Downsize loads
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
WHEN DOING A WHOLE HOME BACKUP CONFIGURATION FOR TESLA BATTERIES WE NEED LOAD CALCULALIONS TO PROVE WE ARE NO EXCEEDING THE TESLA GATEWAY CAPACITY
- Roof Plan Notes
All Jobs [Layout subject to change.]
- Electrical Diagram Notes
All Jobs [Interconnection Method subject to change]
- Label Page
FLORIDA - 2020
- Custom Placards Required
- 1
- Placards Notes
If Tampa electric, please see utility database for placard requirements.
TECO - Tampa Electric Company
- Non Standard Revision Requirements
Add Change in Panel Type Count and layout and make sure all pages are clouded. AHJ wants clear, exact wording of what changed, rather than phrases such as "slight layout change".
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim