Town of Cutler Bay (FL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2023 8TH EDITION FLORIDA BUILDING CODE: BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL
2023 8TH EDITION FLORIDA BUILDING CODE: MECHANICAL
2023 8TH EDITION FLORIDA BUILDING CODE: PLUMBING
2023 8TH EDITION FLORIDA BUILDING CODE: FUEL GAS
2023 8TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION
2023 8TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING
2023 8TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY
2023 8TH EDITION FLORIDA FIRE PREVENTION CODE (NFPA)
2020 NATIONAL ELECTRIC CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- Rough Electrical
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Wet Structural,Wet Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
EE wet stamps and FL Statute
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
4'-6'' setbacks at ridge, gables and flat roof. Any orientation is allowed. Portrait preferred but not necessary
Structural & loads
- Wind Speed
- 175
- Wind Notes
PV modules, Racking, connection, and Stand-offs shall be rated for the wind pressure zones they are installed in. HIGH-VELOCITY HURRICANE ZONE (HVHZ) PV REQUIREMENTS Buildings and structures located within the high-velocity hurricane zone shall comply with the provisions of Sections 1605, 1607, 1611, 1616 through 1626. The High Velocity Hurricane Zone (HVHZ) consists of Miami-Dade and Broward Counties. Sections 1512 through 1525 set forth the minimum requirements for the installation of roofing components, roofing systems and roofing assemblies and the waterproofing there of.
- Snow Load
- 0
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
SE wet stamps on all PV pages, PE Letter / Calcs Two SIF forms, signed and sealed by PE (in files section) After installation, a post-install letter will be required. An example has been uploaded to the files below named PIL Template"."
This AHJ does not accept stamped signature. Wet signature required
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates,MPUs
- Allowed POI
- Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Roof Plan
M1 sealant for comp shingles roofs (attach NOA to plans) GAF flex sealant for tile roofs (attach NOA to plans) 4'-6'' setbacks at ridge, gables and flat roof. Portrait orientation only (Landscape is not allowed)
- Attachment Detail
* Add 'M1 NOA' text to all roof mounted comp shingle projects. See files below * Add 'GAF NOA ' text to all roof mounted tile projects. See files below * Please provide wind pressure calculations for respective HVHZ roof zones * Provide safety factor for LAG BOLT
- Electrical Diagram
**MPUs** * Provide the AIC rating of the new main service panel * Provide information that the new service panel complies with NEC 230.6 and 230.70.
- Label Page
FLORIDA - 2020 CAD BLOCK
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim