Georgia Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2023 NATIONAL ELECTRICAL CODE

2018 INTERNATIONAL BUILDING CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Top Right
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
130
Wind Notes

Exposure Category B

Snow Load
0
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
All Jobs
Allowed POI
Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Electrical Diagram

Centerfed 120%: EE Stamp Required

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

**REQUIRES SEPARATE ZONING PERMIT** No gravel base needed. No height restrictions. No minimum freeze depth. Between 3-15 acres: 15' Front, Side, and Back. 20' from public right of way. Small scale solar energy systems - Occupies less than three (3) acres. 3 acres setback requirements: 25' Front, Side, and Back if within 100' of residential zone or public right of way. Intermediate scale solar energy systems - Occupies three (3) to fifteen (15) acres. The intermediate scale SES shall be located no closer than the lesser of (a) fifteen (15) feet from any property line or easement, or (b) the setback standards for the underlying zoning district, if any; The intermediate scale SES shall be located no closer than the lesser of (a) twenty (20) feet from any public right-of-way, or (b) the setback standards for the underlying zoning district, if any; and The intermediate scale SES shall be located no closer than 50 feet from any residential dwelling unit. Large scale solar energy systems - Occupies more than fifteen (15) acres. The large scale SES shall be located no closer than the lesser of (a) fifteen (15) feet from any property line or easement, or (b) the setback standards for the underlying zoning district, if any; The large scale SES shall be located no closer than the lesser of (a) twenty (20) feet from any public right-of-way, or (b) the setback standards for the underlying zoning district, if any; and The large scale SES shall be located no closer than 100 feet from any residential dwelling unit.