City of Hailey (ID)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2017 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
Fire setbacks
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Snow Load
- 120
- Snow Load Notes
Ground Snow Load 120 lbs
Roof Snow Load 100 lbs
- Reducible Snow Load Allowed
- 1
- Structural Notes
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Service Ground Requirements
For new MBE (Main Breaker Enclosure): Two ground rods are to be driven with continuous EGC landing in MBE.
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
Plan set
- Electrical Diagram
IT-POLARIS 350 service side rated are the ONLY city approved taps for LST.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim