City of Meridian (ID)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FUEL & GAS CODE
2017 IDAHO STATE PLUMBING CODE
2017 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 25
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Plans must be submitted in PDF Format All plans must be submitted in Landscape format in the horizontal position & each sheet must be a different file. All plans need to be drawn to scale. All plans must have a space reserved in the upper left corner for City Approval stamps. 1. PV Array Configuration 2. Grounding 3. Wire Management 4. Conductors 5. Rapid Shutdown of PV Systems on Buildings 6. Charge Controllers 7. Disconnects 8. Inverters 9. Batteries Find solar submittal checklist guidelines- HERE (https://meridiancity.org/building/Go-Live/Solar%20Submittal%20Standards.pdf) Plan Review guidelines- HERE (https://meridiancity.org/building/Residential%20Plan%20Review%20Guidelines.pdf)
- Electrical Diagram
State of Idaho Electrical Application Checklist - click here (https://meridiancity.org/building/Solar%20checklist%2010.25.18.pdf)
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim