City of Chicago (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL BUILDING CODE/ CITY OF CHICAGO BUILDING CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2018 INTERNATIONAL RESIDENTIAL BUILDING CODE

2017 CHICAGO ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

For Flat Roofs: 4' perimeter set back

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
25
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Solar Express permit worksheet to be completed and stamped. All PE documents must be stamped by the same engineer. We cannot mix engineers.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1
BOS Restrictions

System's DC size cannot be more than 1.3 times the AC size

  • Taps NO PIERCING - Tap to be done with a Milbank dual meter Lug which will require a Milbank Meter Can 
  • https://www.milbankworks.com/products/catalog/k4223 Example of dual lug
  • CANNOT have ANY Main Disconnecting Means outdoors

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
  • ESS disconnect required within 6ft of MSP on same wall and not blocked by walls/gates/etc.
  • Label ESS Elevation page and state which wall is shown with a compass direction.
  • ALL City of Chicago projects CANNOT have ANY Main Disconnecting Means outdoors.
  • ALL City of Chicago projects utilizing SE BUI or TESLA GATEWAY will require a Main Breaker Enclosure installed inside property.

Approved Plans showing requirement:

staff-556389

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
Yes - with dimensions

Plan set

Plan Set Requirements

AHJ requires the Solar Express document to be filled and attached to plans for projects over 13.44kWAC. See files section

Do not add MSP pictures for this AHJ. They will kick it back every time.

Roof Plan

For any flat roof we will need to provide the height of the parapet. If the flat roof has no parapet, add a note stating that there is no parapet wall on the flat roof.

Attachment Detail

RM-10 Ballast attachments are not allowed in this AHJ.

Electrical Diagram

Remove ALL mention of NEC

All General Electrical notes shall reference CEC 2018

  • Use IMC conduit (not EMT) per IL standard
  • NO JBOXS FOR TAPS
  • 3LD OR SLD is adequate
  • City of Chicago does not allow tandem breakers in any MSP even if tandems are allowed by manufacturer. Any Tandem breakers installed will need to be relocated to a sub panel or upgrade the MSP
  • Centerfed 120% allowed

Inverter sizing guideline: DC cannot be more than 1.3 times the AC output, please see MAX SIZE ALLOWED PER INVERTER.

  • SE3800 = 4,940
  • SE5000 = 6,500
  • SE6000 = 7,800
  • SE7600 = 9,880
  • SE10000 = 13,000
  • SE11400 = 14,820
  • IF INVERTER NOT LISTED, SIZE multiplied BY 1.3 GETS YOU THE MAX SIZE
Custom Placards Required
0
Non Standard Planset Requirements
Single Line Diagram

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

Trenching MUST be 1" PVC rigid conduit below grade, with a RMC 90 degree elbow to J box above grade

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Chicago (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.