City of Galesburg (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2020 NATIONAL ELECTRICAL CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL FIRE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Structural,Digital Electrical
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes


Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

The raceway for the tapped conductors must be GRC threaded steel conduit.


Current calculations of each loop and input circuit (Isc, Imax,Icontinuous, Voc, Vmax) Location of all and overcurrent protection of all disconnects. Include NEC code sections used.

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

ESS can be installed in any of those locations(Attached garages, Detached Garages, On exterior walls at least 3 ft (914 mm) away from doors or windows, Outdoors at least 3 ft (914 mm) away from doors or windows, Utility closets, Storage, or utility spaces, however if the room is unfinished, the walls and ceiling need to be protected by at least 5/8 in. (16 mm) gypsum board.


Any battery systems installed in a location where they are subject to vehicle damage needs to be protected by approved barriers, usually in the form of safety bollards.


Energy Storage System cannot be located on direct south facing exterior walls


If there is an ESS inside your home then interconnected smoke alarms are required to be installed throughout your house, including any garages or rooms housing ESS units. If you run into a situation where you can’t install a smoke alarm, such as an attached garage, a heat detector must be installed and be connected to the smoke alarms in the rest of the house.

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

CHECKLIST-------->CHECKLIST

SPEC SHEETS MUST HAVE RED BOX AROUND EQUIPMENT BEING USED

EXAMPLE PROJECT ----->EXAMPLE


.Per AHJ:

  1. Solar Panel Datasheet and installation instructions. Highlight, circle around, or somehow identify all part numbers used. Please also circle which part number is used for the (Line (Supply) Side Taps must be "service rated" or some similar designation, rails, clamps, splices, foot adaptors, and IQ Combiner). Inverter(s) datasheet and installation instructions.
Cover Page

Standard

Site

Standard

Site Notes
  • Cloud equipment being used on the spec sheets and include the installation manual for PW3.
Roof Plan

Standard

Attachment Detail

Standard

Electrical Diagram
  • LINE SIDE TAP --> LEADER MUST READ (N)LINESIDE TAP VIA UL LISTED CONNECTORS SUITABLE FOR USE ON THE LINE SIDE OF THE SERVICE EQUIPMENT
  • LINE SIDE TAP CONDUIT FROM DISCO TO POI MUST BE GRC
  • All external conduit to be IMC or RMC - Inverter/DC/POI
  • PVC is only allowed underground with nothing above grade.
  • Conduit for service entrance conductor must be RMC or IMC
  • Voltage drop and ampacity calculations are required
  • Energy Storage System cannot be located on direct south facing exterior walls
Electrical Diagram Notes

Battery [ESS units spaced according to UL 9540 listing or with 3’ spacing between units and between units and doors or windows entering the dwelling unit]

Label Page

placard required

Custom Placards Required
1
Placards Notes

A site map placard showing all BOS location is required for EVERY project.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes

GM cannot be larger than 200 SQ FT in residential areas. Example Project: Corrine Little (607640).

§ 152.123 SOLAR ENERGY SYSTEMS.

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5