Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Monmouth (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2015 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2015 Building Code
Code List

2012 INTERNATIONAL BUILDING CODE

2012 INTERNATIONAL RESIDENTIAL CODE FOR ONE & TWO FAMILY DWELLINGS

2012 INTERNATIONAL MECHANICAL CODE

2012 INTERNATIONAL FIRE PREVENTION CODE

2012 EXISTING BUILDING CODE

2012 INTERNATIONAL PROPERTY MAINTENANCE CODE

2020 NATIONAL ELECTRICAL CODE ILLINOIS ACCESSIBILITY CODE

2004 ILLINOIS STATE PLUMBING CODE CITY OF MONMOUTH CODE OF ORDINANCES, as amended

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
1
Minimum Ground On Roof
#10

Electrical

Allowed POI
Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Plan set

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Monmouth (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.