City of Neoga (IL)
NEC Code Version2014
Fire Code Version2015 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2014
- Fire Code Version
- 2015 Building Code
- Code List
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE
2015 INTERNATIONAL RESIDENTIAL BUILDING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2015 INTERNATIONAL SOLAR ENERGY PROVISIONS, AND ORDINANCE 2014 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Date On Stamps
- N/A
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Setback Front Yard
- 5
- Setback Back Yard
- 5
- Setback Side Yard
- 5