City of Red Bud (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Fire Code Version2015 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2014
Fire Code Version
2015 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE

2021 INTERNATIONAL RESIDENTIAL BUILDING CODE

2014 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
Other (See Submission Notes)
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
107
Wind Notes

https://ascehazardtool.org/

Snow Load
23
Snow Load Notes

https://ascehazardtool.org/

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard ESS Requirements

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

AHJ does not allow panels to be installed on the front or sides of the home, only the back of the home.

Cover Page

Standard

Site

Standard

Roof Plan

Standard

Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Ground Mount Solar not allowed per AHJ.

Setback Front Yard
0
Setback Back Yard
0
Setback Side Yard
0
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Red Bud (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.