City of Rockford (IL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2015 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 1
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' From Rake and 3 along the Ridge
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS must be 3' from doors and windows.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
TLD/ELD needs to show two ground rods.
EXAMPLE PLANS:
EXAMPLE
staff (617672)
- Roof Plan Notes
- Electrical Diagram
**2 ground rods as well as cold water ground. Also, neutral/ground bond @ MSP.
All Jobs [EMT is allowed with approved fittings and not subject to physical damage, IMC or Rigid conduit is acceptable when subject to physical damage // NEUTRAL AND GROUND TO BE BONDED TOGETHER, VIA GREEN BOND SCREW, BOND STRAP, OR BOND JUMPER]
If we are adding a subpanel this will also need sizing of wires and IMC/Rigid shown on SLD
SPD needs to be added to MSP and Sub-panel during MPU
Neutral and GROUND bond to take place at 1st means of disconnect.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim