City of Saint Charles (IL)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
INTERNATIONAL FIRE CODE
2018 ILLINOIS ENERGY CODE INTERNATIONAL SOLAR ENERGY PROVISIONS CODE ST CHARLES MUNICIPAL CODE SECTION 13.08.315 & 13.08.320
2020 NATIONAL ELECTRICAL CODE W/ ST. CHARLES AMENDMENTS
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 75
- De Rating Ampacity
- 1
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
EMT not allowed.
LINE SIDE TAP NOT ALLOWED.
POI MUST BE A BREAKER INSIDE THE MSP (INSIDE HOME)
#6 EGC from mods to inverter Wire Ampacity - do not use 90 degree ratings, use 75 degree (per staff)
Show DC conductors on the wire calculation table
Informational note: Customer must have meter/main outside and MB inside MSP (disconnects outside and inside) otherwise upgrade will be required. (per staff)
- Electrical Diagram Notes
Conduit mounted 2" off of roof using Unirac Conduit mount
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
- 10' Setback from house (principal structure) Cannot be taller than 20'
- Design review is needed if located in RT, BL, BC, OR, CBD-1 and CBD-2 zoning districts (call city to check)
- Cannot be located within an easement