Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

County of Will (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2015 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2015 Building Code
Code List

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL RESIDENTIAL CODE, APPENDIX G

2017 NATIONAL ELECTRIC CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

2012 IBC/IRC 3' setbacks

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
25
Snow Load Notes

30psf ground snow load 25psf roof snow load

Reducible Snow Load Allowed
0
Max Attachment Spacing
48
Structural Notes

Structural Calcs must include Uplift Calcs and Ridge Beam Calcs SE digital stamps on corresponding PV pages & PE Letter / Calcs. PE Structural Calcs need stamp and signature on all pages and pages need to be numbered in this format 1 of x, 2 of x, 3 of x and so on.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
75
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements


Max AC system size is capped at 10k, 11.4 inverters are not applicable.

Cover Page

All roof mounted solar requires critter guard per AHJ.

Site

Side of Home Photos from Sitecapture added to the Planset - AHJ requires Side Elevation photos. Please refer to "Elevation Example" added to the files below.

Roof Plan

* AHJ requires all street facing modules to be flush mounted. They define flush mounted as modules with no more than 6 height off roof surface. * Will need to show rafter/truss and attachment points on panel layout

Attachment Detail

* AHJ requires all street facing modules to be flush mounted. They define flush mounted as modules with no more than 6 height off roof surface. Please provide the height of the panels from the roofline. * All houses should have collar ties 4' on center in the upper 1/3 of the attic space. If these are not present, they will need to be installed in order to proceed with installation. * Stagger attachments @ 48 o.c. unless rafter upgrades are required

Electrical Diagram

Standard

Label Page

One photo of each side of exterior of home is required in planset

Custom Placards Required
0
Non Standard Planset Requirements
BOS Elevation

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes
  • Allowed - Will need Health Dept Approval
  • GEC at array
  • Use Will County GIS, if flood zone is close to array AHJ wants a stamped site plan with: 1. Base Flood Elevation (BFE) line - FEMA Flood Map 2. Topography - Contour lines in GIS 3. Erosion control plan
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Will (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.