Township of Milton (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2014
Fire Code Version2015 Building Code
Wet Stamps RequiredNone
Fire Setback EnforcedYes

Codes

NEC Code Version
2014
Fire Code Version
2015 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2024 ILLINOIS ENERGY CONSERVATION CODE

2015 INTERNATIONAL FIRE CODE

2015 INTERNATIONAL SOLAR ENERGY PROVISIONS AND ORDINANCE

2021 INTERNATIONAL RESIDENTIAL BUILDING CODE

2014 NATIONAL ELECTRICAL CODE

IEBC Accepted
Yes
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
No
Rough Inspection
None
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No
Stamp Location On Plans
N/A

Fire setbacks

Fire Setback Enforced
Yes

Structural & loads

Wind Speed
115
Wind Notes

https://ascehazardtool.org/

Snow Load
30
Snow Load Notes

https://ascehazardtool.org/

Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
N/A
Supply Tap Neutral Ground Bond Required
Yes
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard ESS Requirements

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Standard

Cover Page

Standard

Site

Standard

Roof Plan

Standard

Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Standard Ground Mount requirements

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Township of Milton (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.