Township of Waltham (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2014
Fire Setback Enforced0

Codes

NEC Code Version
2014
Code List
2002 NATIONAL ELECTRIC CODE 2003 INTERNATIONAL RESIDENTIAL CODE 2003 INTERNATIONAL BUILDING CODE 2003 INTERNATIONAL FIRE CODE 2003 INTERNATIONAL MECHANICAL CODE 2003 INTERNATIONAL FUEL GAS CODE
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
0
Setback Notes
Standard

Structural & loads

Wind Speed
90
Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim