Village of Bedford Park (IL)
NEC Code Version2014
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced0
Codes
- NEC Code Version
- 2014
- Code List
2021 INTERNATIONAL BUILDING CODE (with Amendments) 2021 INTERNATIONAL RESIDENTIAL CODE (with Amendments) 2021 INTERNATIONAL FIRE PREVENTION CODE (with Amendments) 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL PROPERTY MAINTENANCE CODE 2018 CHICAGO ELECTRICAL CODE (with Amendments) 2018 ILLINOIS ACCESSIBILITY CODE 2018 ILLINOIS ENERGY CONSERVATION CODE 2021 NATIONAL FIRE PROTECTION ASSOCIATION 101 Life Safety Code All Village of Bedford Park Codes (Ordinances)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim