Village of Bellwood (IL)
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL SOLAR ENERGY CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL SWIMMING POOL AND SPA CODE
2018 INTERNATIONAL PROPERTY MAINTENANCE CODE
2017 NATIONAL ELECTRICAL CODE
2018 Part 400 STATE OF ILLINOIS ACCESSIBILITY CODE
2018 STATE OF ILLINOIS ENERGY CODE
2014 STATE OF ILLINOIS PLUMBING CODE
VILLAGE OF BELLWOOD BUILDING CODE CHAPTER 150
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 3
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3' From Rake and 3 along the Ridge
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
FOR LINE SIDE TAPS: AHJ DOES NOT ALLOW FUSED DISCONNECT, we must use a breaker box. POI/TAP > Breaker box > UNfused Disco > Inverter
- Label Page
- Custom Placards Required
- 0
- Placards Notes
- AHJ REQUIRES REFLECTIVE PLACARDS.
- Non Standard Revision Requirements
The AHJ explicitly requires:
1. Point-by-point letter responding to all corrections
2. Rev clouds and Deltas
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim