Village of Elwood (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL FUEL GAS CODE 2017 NATIONAL ELECTRIC CODE 2014 ILLINOIS PLUMBING CODE 2018 INTERNATIONAL PROPERTY MAINTENANCE CODE 2018 INTERNATIONAL FIRE CODE 2018 ILLINOIS ACCESSIBILITY CODE 2015 NATIONAL FIRE PROTECTION ASSOCIATION 101 LIFE SAFETY CODE 2018 INTERNATIONAL URBAN-WILDLAND INTERFACE CODE 2018 INTERNATIONAL EXISTING CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL SWIMMING POOL AND SPA CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

1.Provide a response letter and cloud and highlight changes made to the drawings. Upon receipt of the requested information a subsequent plan review with additional comments may be necessary

Cover Page Notes

1. Local Inspector shall field verify all smoke alarms and carbon monoxide are up to code and in proper working order. The smoke alarms are required within each sleeping room, within fifteen feet (15โ€™-0โ€) of sleeping rooms, on each story. The devices are to be interconnected and be provided with normal power where available.


2. A qualified Electrician, approved plans, specification sheets, interior and attic access (if required), and a ladder are required to be available on-site at time of inspections. It is recommended that photos of the installation on the roof be available on site.

Roof Plan

1. Indicate on the plans that photovoltaic arrays occupying not more than thirty-three percent (33%) of the plan view total roof area, not less than an eighteen-inch (18โ€) clear setback is required on both sides of a horizontal ridge. For photovoltaic arrays occupying more than thirty-three percent (33%) of the plan view total roof area, not less than a thirty-six-inch (36โ€) clear setback is required on both sides of a horizontal ridge.

Electrical Diagram Notes

1. Local Inspector shall field verify proper electrical grounding/bonding at the first point of disconnect. If the ground rod is testing over twenty-five (25) ohms, then two (2) grounding rods shall be connected to the ground bar in the utility meter. The two (2) ground rods shall be a minimum of six feet (6โ€™) apart.


2.Local Inspector shall field verify the bonding of the water pipe system at the water heater(s). The water heater(s) shall be bonded between the cold and hot water pipes with a jumper sized according to NEC Table 250.66, per NEC 250.104(A)(1); and any metal gas piping shall be bonded, per NEC 250.104(B). 

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Elwood (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.