Village of Hudson (IL)
NEC Code Version2011
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2011
- Code List
2012 INTERNATIONAL BUILDING CODE
2012 INTERNATIONAL RESIDENTIAL CODE
2012 INTERNATIONAL MECHANICAL CODE
2011 NATIONAL ELECTRICAL CODE
2012 INTERNATIONAL ENERGY CONSERVATION CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Top Right
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
3ft setback required around arrays
Structural & loads
- Wind Speed
- 90
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Spec sheets for solar system components must have UL listing or approved equivalent.
- Roof Plan
Roof mount solar energy systems shall not occupy more than eighty percent (80%) of the aggregate square footage of the roof area.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
* For digital copies of the septic documentation contact the Mclean county health dept 888-5482 * The height shall not be greater than 12 feet at maximum tilt of the solar panels * GM cannot be in the front or side yards. * No more than one GM system per lot.