Village of Maple Park (IL)
Codes
- NEC Code Version
- 2023
- Code List
2021 International Building Code
2021 International Residential Code for One-and Two-Family Dwellings
International Energy Conservation Code - Current Edition with State of Illinois Amendments.
2021 International Fire Code
2021 International Plumbing Code
2021 International Mechanical Code
2021 International Fuel Gas Code
2021 International Swimming Pool and Spa Code
2021 International Existing Building Code
2021 International Property Maintenance Code
2023 National Electrical Code
Illinois Plumbing Code - Current Edition
NFPA 101 Life Safety Code - Current Edition, as it applies to state buildings, state licensed facilities, and other occupancies under the purview of the OSFM.
Illinois Accessibility Code - Current Edition.
2010 ADA Standards for Accessible Design
Illinois Radon Resistant Construction Act - Current Edition.
Illinois Elevator Safety Act - Current Edition.
Illinois Smoke Detector Act - Current Edition.
Illinois Carbon Monoxide Alarm Detector Act - Current Edition.
Illinois Electric Vehicle Charging Act - Current Edition.
Illinois Urban Manual - Current Edition.
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,Meter Adapter,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
2006 IBC - 3 feet from ridge and sides
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim