Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Village of Roselle (IL)

Illinois Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2020 NATIONAL ELECTRIC CODE WITH AMENDMENTS 2018 INTERNATIONAL RESIDENTIAL CODE WITH AMENDMENTS 2018 INTERNATIONAL BUILDING CODE WITH AMENDMENTS 2018 INTERNATIONAL MECHANICAL CODE WITH AMENDMENTS 2018 INTERNATIONAL FUEL GAS CODE WITH AMENDMENTS 2018 INTERNATIONAL FIRE CODE WITH AMENDMENTS 2014 ILLINOIS STATE PLUMBING CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE WITH AMENDMENTS 2018 INTERNATIONAL EXISTING BUILDING CODE WITH AMENDMENTS 2018 INTERNATIONAL SWIMMING POOL SPA CODE WITH AMENDMENTS 2018 NFPA 101 LIFE SAFETY CODE 2018 ILLINOIS ACCESSIBILITY CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
3
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
90
Wind Notes

Exposure Category B

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Provide a photo of the existing main service panel with the cover off. Provide a photo of the existing Com Ed meter, and where/how will the Distributed Generation System be connected. Indicate if and how any conduit to be run through the attic will be installed and secured

Cover Page Notes

All Jobs [Photovoltaic Modules shall not be installed over any attic, plumbing or mechanical vent. Plumbing vents to extend a minimum of 12 inches above roof or modules. No building, plumbing or mechanical vents are to be covered, obstructed or routed around modules. // All wiring must be properly supported by devices or mechanical means designed and listed for such use. Wiring shall be permanently and completely held off of the roof surface. Wires shall be secured by cable ties, straps, hangers or similar fittings at intervals not exceeding 4.5 feet. Wires shall be secured within 12 inches of each box, cabinet, conduit body or other termination.]

Electrical Diagram

Standard

Electrical Diagram Notes

All Jobs [Any code violations to the existing electrical system (i.e., Grounding, Bonding, etc.) shall be brought into compliance prior to Solar System installation. A separate Permit may be required for the upgrade work. // Crimp on terminals shall be listed and installed using a listed tool specified for use in crimping those specific crimps // Twist on wire connectors shall be listed for the environment (i.e., wet, damp, etc.) and shall be installed per manufacturer’s installation instructions.]

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Village of Roselle (IL) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.