Town of Plymouth (MA)

Massachusetts Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

10TH EDITION OF THE MA STATE BUILDING CODE 780

2021 INTERNATIONAL BUILDING CODE W/780 CMR

2021 INTERNATIONAL RESIDENTIAL CODE W/780 CMR

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL FIRE CODE

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
Other (See Submission Notes)
Revision Required
0
Rough Inspection
Rough Electrical
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes
No EE required
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Fire access pathways are to be placed so that a firefighter can access the ridge without being in arm's reach of energized supply lines.

Fire department requirements for Plymouth, MA

No vents, chimneys, or stink pipes can be in the setbacks - the pathways need to be 100% clear.

Firefighter ladder access paths are perpendicular from ridge to gutter.

Firefighter ladder access paths do not follow diagonal hip ridges or hip valleys or cross dormers.

Structural & loads

Wind Speed
100
Wind Notes

https://www.plymouth-ma.gov/advanced-search?keywords=wind+speed (https://www.plymouth-ma.gov/inspectional-services/files/110-mph-wind-construction-checklist)

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Non Standard Planset Requirements
Home Elevation

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

GM setbacks are determined by the residential district of the home. Please reference chart uploaded to the files section named "GM Setbacks by District". GM systems must have an installer contact information placard.

Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Plymouth (MA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.