City of Bowie (MD)

Maryland Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

SUB TITLE 4 PRINCE GEORGE'S COUNTY BUILDING CODES

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL SWIMMING POOL AND SPA CODE

2018 LIFE SAFETY CODE

2017 NFPA 70 NATIONAL ELECTRICAL CODE SUBTITLE 9 PRINCE GEORGE’S COUNTY ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
Other (See Submission Notes)
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
0
Setback Notes

Not enforced

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
35
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

**09/16/21 GB - See note below in Electrical Section for a change to this.** If there is to be a fused disco inside, use a flush-mounted load center with breaker instead of a surface-mounted knife-blade switch. Former is aesthetically pleasing. Latter is not. [a past project (Tony). DCR 052021]

Minimum Ground On Roof
#8

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Load Side Taps,PV Breaker,Meter Adapter
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

If there is to be a fused disco inside, use a flush-mounted breaker housing instead of a surface-mounted knife-blade switch. Former is aesthetically pleasing. Latter is not. If lineside tap requires non fused disconnect inside the home with a non fused disconnect outside.

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

If there is to be a non fused disco inside, use a flush-mounted load center with breaker instead of a surface-mounted knife-blade switch out side. Former is aesthetically pleasing. Latter is not. Per conversation with Branch Manger see note below in Files Section If lineside tap requires non fused disconnect inside the home with a non fused disconnect outside. Check service cable to see if frayed If so will require replacement to pass inspection

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Bowie (MD) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.