Town of Wayne (ME)
NEC Code Version2023
Fire Code Version2015 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2015 Building Code
- Code List
MAINE UNIFORM BUILDING AND ENERGY CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Ridge Setback
- 3
- Rake Setback
- 3
- Hip Valley Setback
- 3
- Eave Setback
- 3
- Setback Notes
A minimum 3-foot buffer zone is required
- From the ridge on BOTH sides and one edge of the eave or parapet.
- This includes the area around chimneys.
Structural & loads
- Wind Speed
- 90
- Snow Load
- 80
- Reducible Snow Load Allowed
- 1
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Allowed POI
- Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
Plan set
- Plan Set Requirements
For Roof-Mounted Systems, a 3-foot setback is required
- From the ridge
- From the chimney edge
(As per the Code Officer’s instructions.)
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim