Town of West Bath (ME)
NEC Code Version2023
Fire Code Version2015 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2015 Building Code
- Code List
MAINE UNIFORM BUILDING AND ENERGY CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL MECHANICAL CODE
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- N/A
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 90
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
Plan set
- Plan Set Requirements
The height of the roof mounted panels cannot exceed 35 feet above grade
- Custom Placards Required
- 0
Ground mount
- Ground Mount Notes
- If the Small Solar Energy System is a ground mounted system, it shall not exceed fifteen (15) feet in height
- All onsite utility and transmission lines extending to and from a Small Solar Energy System that is not attached to the principal structure on the property shall be placed underground, unless the applicant demonstrates good cause for the Planning Board to waive this requirement