Charter Township of Clinton (MI)

Michigan Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 MICHIGAN BUILDING CODE

2015 MICHIGAN RESIDENTIAL CODE

2021 MICHIGAN REHABILITATION CODE

2021 MICHIGAN MECHANICAL CODE

2021 MICHIGAN RESIDENTIAL ENERGY CODE

2015 MICHIGAN ENERGY CODE

2023 NATIONAL ELECTRICAL CODE

2023 MICHIGAN ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Top Right
Date On Stamps
Date Plans are Stamped

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
108
Wind Notes

https://ascehazardtool.org/

Snow Load
35
Snow Load Notes

https://ascehazardtool.org/

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
Panel Schedule Required
Partial Home Backup
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

For all ESS projects:

  • Include Installation details in cutsheets.

ESS Location Shown

  • Site/Roof plan: Show exact location of the Energy Storage System (inside or on building).
  • Example: Mounted on the interior garage wall adjacent to the main electrical panel. (Common because garages offer separation from living spaces and easy access for installers/first responders.)

Fire-Rated Assembly Details

  • Site/Roof plan: Indicate fire-resistance rating and how the ESS is protected (walls, barriers, etc.)
  • Example: ESS installed behind a 1-hour fire-rated drywall assembly on the garage side of the house (e.g., 5/8" Type X gypsum board on the shared wall between garage and living space). Show how the ESS maintains required clearance from combustible surfaces per code.

Materials Specified

  • Site/Roof plan: List all proposed materials for the fire-rated assembly and adjacent construction.
  • Example: 5/8" Type X gypsum board, fire-rated sealant at penetrations, metal mounting bracket rated for the ESS weight, and non-combustible backing panel. List manufacturer/model if required.

Ventilation Design (if needed)

  • Site/Roof plan: State "No Ventilation needed for ESS system"
  • Example: Passive ventilation via louvered vent in garage door plus a small wall-mounted exhaust fan tied to a temperature sensor to activate if battery temperature exceeds threshold (for systems that specify off-gassing or heat concerns). Show intake and exhaust locations and airflow path.

Smoke/Heat Detection/Alarm Provisions

  • Site/Roof plan: State "Home is equipped with smoke and carbon monoxide detectors"
  • Example: Heat detector mounted on the ceiling above the ESS location in the garage, tied into the home’s existing alarm panel or standalone audible alarm if not interconnected. Include a smoke detector in the vicinity per local code.


AHJ will not allow exterior wall mount if exterior wall is made of brick.

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
Yes

Plan set

Plan Set Requirements

Standard

Cover Page

Standard

Cover Page Notes


Site

For all ESS projects:

  • Include Installation details in cutsheets.


ESS Location Shown

  • Site/Roof plan: Show exact location of the Energy Storage System (inside or on building).
  • Example: Mounted on the interior garage wall adjacent to the main electrical panel. (Common because garages offer separation from living spaces and easy access for installers/first responders.)

Fire-Rated Assembly Details

  • Site/Roof plan: Indicate fire-resistance rating and how the ESS is protected (walls, barriers, etc.)
  • Example: ESS installed behind a 1-hour fire-rated drywall assembly on the garage side of the house (e.g., 5/8" Type X gypsum board on the shared wall between garage and living space). Show how the ESS maintains required clearance from combustible surfaces per code.

Materials Specified

  • Site/Roof plan: List all proposed materials for the fire-rated assembly and adjacent construction.
  • Example: 5/8" Type X gypsum board, fire-rated sealant at penetrations, metal mounting bracket rated for the ESS weight, and non-combustible backing panel. List manufacturer/model if required.

Ventilation Design (if needed)

  • Site/Roof plan: State "No Ventilation needed for ESS system"
  • Example: Passive ventilation via louvered vent in garage door plus a small wall-mounted exhaust fan tied to a temperature sensor to activate if battery temperature exceeds threshold (for systems that specify off-gassing or heat concerns). Show intake and exhaust locations and airflow path.

Smoke/Heat Detection/Alarm Provisions

  • Site/Roof plan: State "Home is equipped with smoke and carbon monoxide detectors"
  • Example: Heat detector mounted on the ceiling above the ESS location in the garage, tied into the home’s existing alarm panel or standalone audible alarm if not interconnected. Include a smoke detector in the vicinity per local code.
Roof Plan

Standard

Attachment Detail

Standard

Electrical Diagram

Standard

Label Page

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Standard Ground Mount requirements

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Charter Township of Clinton (MI) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.