City of Pine Island (MN)
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2017
- Fire Code Version
- 2018 Building Code
- Code List
2020 MINNESOTA STATE BUILDING CODE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL PLUMBING CODE
2017 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- Footing inspection
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
- If modules cover 33% or less of the roof, install them at least 18" below the ridge.
- If modules cover more than 33%, install them at least 36" below the ridge.
- Provide two 36" wide pathways from the lowest roof edge to the ridge, on separate roof planes.
- At least one pathway must be on the driveway or street side of the roof.
- Each roof plane with solar panels needs a 36" pathway from the lowest edge to the ridge, on the same or adjacent roof plane.
- Pathways should support firefighters and avoid obstructions (e.g., vent pipes or conduit).
- Do not place panels under emergency escape openings unless a 36" clear path is provided for easy escape.
Structural & loads
- Wind Speed
- 115
- Wind Notes
https://ascehazardtool.org/
- Snow Load
- 35
- Snow Load Notes
https://ascehazardtool.org/
Ground mount systems shall support a ground snow load of at least 50 psf
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard ESS Requirements
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Standard
- Cover Page
Standard
- Site
Standard
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
Standard
- Label Page
Standard
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Standard Ground Mount requirements
- Setback Front Yard
- 10
- Setback Back Yard
- 5
- Setback Side Yard
- 5