City of Raleigh (NC)
NEC Code Version2017
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2017
- Code List
2018 NORTH CAROLINA STATE BUILDING CODE 2018 NORTH CAROLINA STATE RESIDENTIAL CODE 2018 NORTH CAROLINA STATE EXISTING BUILDING CODE 2018 NORTH CAROLINA STATE ELECTRICAL CODE 2018 NORTH CAROLINA STATE FIRE CODE 2018 NORTH CAROLINA STATE STATE CODE 2018 NORTH CAROLINA ADMINISTRATIVE CODE AND POLICIES
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes - Multiple Layer Shingle,Yes - Roof Not Asphalt or Metal
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 15
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
- SE Stamps/Calcs required if: The weight of the PV System exceeds 3 pounds PSF The roof possesses more than 1 layer of asphalt shingles The roofing material consists of a type other than asphalt shingles or metal The roof is located in a 140MPH or greater wind zone
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim