Town of Amherst (NH)
Codes
- NEC Code Version
- 2020
- Code List
2021 NH STATE BUILDING CODE
2021 NH STATE FIRE CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL SWIMMING POOL AND SPA CODE
2021 NFPA 1, FIRE CODE AS AMENDED BY SAF-FMO 300
2021 NFPA 101 LIFE SAFETY CODE AS AMENDED BY SAF-FMO 300
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Building permit applications are processed as quickly as possible, however, many factors play a role into the length of time a permit application takes. Accuracy and completeness of information have a major effect on application review time, as well as the fluctuations in the seasonal workload. Permit applications with incomplete or missing information only delay an approval process. Good project planning is the best way to assure your permit will be ready when you are. Permit applications are available anytime so there are no restrictions against applying for a permit months in advance of your project. All permit fees must be paid prior to the Building Official reviewing or approving a permit. Electrical, plumbing and mechanical permits may be issued as a Permit On Demand (https://www.amherstnh.gov/building-code-enforcement/faq/what-permit-demand), provided the work _is not part of a project that requires a building permit_. When a building permit is required for a project any mechanical system permit will not be issued until the building permit has been issued.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim