Town of Sugar Hill (NH)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 NH STATE BUILDING CODE
2021 NH STATE FIRE CODE
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL SWIMMING POOL AND SPA CODE
2021 NFPA 1, FIRE CODE AS AMENDED BY SAF-FMO 300
2021 NFPA 101 LIFE SAFETY CODE AS AMENDED BY SAF-FMO 300
2020 NATIONAL ELECTRICAL CODE
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 100
- Snow Load
- 999
- Snow Load Notes
This is a Case Study area, which requires site-specific Case Studies to establish ground snow loads and should be approved by the Authority Having Jurisdiction.
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS Requirements NFPA 855
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Standard
- Cover Page
Standard
- Site
Standard
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
Standard
- Label Page
Standard
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Ground mounted arrays must have all electrical components that can be reached from the ground shielded. Ground arrays must be set in the ground to the 60โ frost line Ground arrays must meet the lot line setbacks in every position that the array can be in
- Setback Front Yard
- 10
- Setback Back Yard
- 5
- Setback Side Yard
- 5