Township of Ewing (Mercer County) (NJ)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 3
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Wet Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 30
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Raised seal required for (3) plans. SE raised seal wet sign on corresponding PV pages & PE Letter / Calcs. Mail 3 sets on 11x17.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,PV Breaker,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Electrical Diagram
If lineside tap (LST), then a Hoffman Tap Box (junction box) is required.
- Electrical Diagram Notes
Please provide supporting documentation (SPECS) for the SUPPLY SIDE TAP device that complies with article 230.46 of the 2020 NEC.
230.46 Spliced and Tapped cConductors. Services-entrance conductors shall be permitted to be spliced or tapped in accordance with 110.14, 300.5(E), and 300.13. Power distribution blocks, pressure connectors, and devices for splices and taps shall be listed. Power distribution blocks installed on service conductors shall be marked "suitable for use on the line side of the service equipment " or equiavlent.
- Custom Placards Required
- 1
- Placards Notes
Inspection requires placard showing "MULTIPLE SOURCES OF POWER WITH DISCONNECTS LOCATED AS SHOWN"
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Ground mount solar panel installation is not allowed due to AHJ zoning restrictions.