New Jersey Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredWet Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2021 INTERNATIONAL EXISTING BUILDING CODE

2021 INTERNATIONAL FUEL GAS CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL PLUMBING CODE

2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
4
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Wet Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
120
Wind Notes

Exposure Category B

Snow Load
20
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

**Raised seal required on (4) plans.** SE raised seal wet sign on corresponding PV pages & PE Letter / Calcs. WS:120mph. Exposure B. SL: 20psf Mail 4 sets on 11x17. 201 Commerce Dr Ste. 5 Moorestown, NJ 08057

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
1

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Zoning officer requires that the page in the planset showing mounting details show that the distance from the roof surface to the **TOP** of the solar pane will be **less than** 6 inches. He also requires that this be **DRAWN TO SCALE**. I've been informed by design that drawing the page to scale isn't possible so **for all projects in this AHJ please create an elevation drawing showing a basic front and side view of the house with mods installed. Please be sure it's notated that the TOP of the solar panels will be less than 6 inches from the roof surface.** -KR

Attachment Detail

5/27/21 - Update - in conversation with design it's been determined that the required page cannot be drawn to scale. To satisfy AHJ requirements, please create an elevation drawing of the house with solar panels. Drawing must have note stating that the TOP of the solar panels will be less than 6 inches off the roof surface. -KR Must show distance from roof to top of panel (6'' max) -DB * **AHJ requires that drawing showing distance from roof to top of panel is DRAWN TO SCALE -KR** ** ** **IF THE PROPOSED SOLAR PANELS PROJECT MORE THAN 6 INCHES, THEN PLEASE PROVIDE A BUILDING ELEVATION, DISPLAYING THE NEW BUILDING HEIGHT. -KR**

Electrical Diagram

If lineside tap (LST), then a Hoffman Tap Box (junction box) is required.

Electrical Diagram Notes


Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Township of Neptune (Monmouth County) (NJ) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.