Township of West Orange (Essex County) (NJ)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL PLUMBING CODE
2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 3
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Wet Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 25
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
***Check plans. AHJ does not accept "NEMA 3R RATED LOCKABLE JUNCTION BOX" for the exterior tie-in** SE raised seal wet sign on corresponding PV pages & PE Letter / Calcs. Mail 3 sets on 11x17.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Elevation view required, showing the height of the structure mods are installed on. See example in files section
Check plans. AHJ does not accept NEMA 3R RATED LOCKABLE JUNCTION BOX for the exterior tie-in The AHJ requires the height of the structure with the modules included to be listed on the plans.
- Electrical Diagram
Received call from staff (AHJ electrical plan reviewer/inspector) on 09/24/20 regarding project for Kelli Rosario. He stated a lockable junction box is _**not**_ accepted by the utility as an enclosure for the exterior tie-in. Any kind of alternative, weather rated, non-lockable enclosure is acceptable. -KR
- Electrical Diagram Notes
LST [A TAPBOX MAY BE USED IN LIEU OF PERFORMING THE LINESIDE TAP IN THE MAIN SERVICE PANEL. THIS IS DEPENDENT UPON SITE CONDITIONS]
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim