City of Truth or Consequences (NM)
NEC Code Version2020
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2020
- Code List
2018 INTERNATIONAL BUILDING CODE 2018 INTERNATIONAL RESIDENTIAL CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE 2018 INTERNATIONAL EXISTING BUILDING CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 15
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- Our PM and AC disco has be within 5 ft of the UM and add an additional disco on the exterior of the home Interconnection and Net Metering Rules: Rule 17.9.568 covers interconnections for qualifying and non-qualifying facilities as large as 10MW Rule 17.9.570 provides guidelines for metering and billing for qualifying facilities. The New Mexico Interconnection Manual Comply With: NFPA 70: National Electric Code, NEC New Mexico Administrative Code Title 14, Chapter 10: New Mexico Electrical Code City of Truth or Consequences Building Code No Rec Meter is required
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim