City of Henderson (NV)

Nevada Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusNot accepted
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2024 INTERNATIONAL BUILDING CODE

2024 INTERNATIONAL EXISTING BUILDING CODE

2024 INTERNATIONAL RESIDENTIAL CODE

2024 INTERNATIONAL FIRE CODE

2024 INTERNATIONAL WILDLAND-URBAN INTERFACE CODE

2024 UNIFORM MECHANICAL CODE

2024 UNIFORM PLUMBING CODE

2024 INTERNATIONAL SWIMMING POOL AND SPA CODE

2024 INTERNATIONAL ENERGY CONSERVATION CODE

2023 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Not accepted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
1
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes

PE Instructions 

SE / EE digital stamps on all PV pages 1-7a, digitally stamped PE Letter & Calcs. PE Stamps need to have verifiable PDF valid digital signatures. Deliver stamped documents that are unlocked to allow for AHJ markup and digital stamp.

SE and EE stamps and digital Signature must show meta data next to stamp.


Digitally Verified Signature required.

Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
0
Snow Load Notes

N/A

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

ALL ENGINEERED DRAWINGS NEED TO HAVE DIGITAL SIGNATURES


PE Instructions 

SE / EE digital stamps on all PV pages 1-7a, digitally stamped PE Letter & Calcs. PE Stamps need to have verifiable PDF valid digital signatures. Deliver stamped documents that are unlocked to allow for AHJ markup and digital stamp.

SE and EE stamps and digital Signature must show meta data next to stamp.


Digitally Verified Signature required.

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
All Jobs
Allowed POI
Meter Adapter,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.87

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Batteries are not allowed on South or West walls due to the extreme summer heat.


When Battery needs to be installed in garage. Garage placement requirements:

  • No matter where the battery is in the garage, it needs bollards.
  • Bollards only need to be 6" away from battery instead of previous guidelines of 3ft
  • Only 2 bollards are needed on leading edge. 
  • Bollard is not needed Infront of inverter

Heat and smoke detectors are required. 

Relocate battery meter socket & disconnect switch to the battery branch leg of the PV circuit with battery socket closest to the batt storage unit. There shall be no meter socket/disc switch at where the backup panel is located (AC coupled system). Batt > PM > Disco > Combiner

Separate ESS Disconnect Required
Local Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

ALL JOBS

  • 8x10 minimum photos showing the roof(s) where the modules are to be located 
  • An 8x10 minimum photo of the MSP or Sub panel that we are going to be landing our PV breaker in and a photo of the main breaker, also photo of the Panel Specs. Photos must show the panel open with the dead front off and a clear view of all the breakers present.
  • Photos have to be high resolution and specs should be clearly readable.
  • Spec sheet required for any sub panel, MPU, load center, etc. 
  • Electrical Load Calcs for all projects
  • Flatten plans /remove PDF layers


BATTERY (Batteries mounted in garage)

  • Provide floor plan with all code compliant information for power walls.
  • Floor plan must include the lighting with switch locations


PRODUCTION HOMES NEW BUILT

***NEW CONSTRUCTION & OWNER AUTHORIZATION FORM NOT REQUIRED***

Cover Page Notes

PRODUCTION HOMES NEW BUILT

***NEW CONSTRUCTION & OWNER AUTHORIZATION FORM NOT REQUIRED***

Site
  • If project has existing solar thermal panels, show location on plans 
Site Notes

PRODUCTION HOMES NEW BUILT

***NEW CONSTRUCTION & OWNER AUTHORIZATION FORM NOT REQUIRED***

Electrical Diagram

LOAD CALCS FOR EVERY PROJECT

AHJ requires SLD & THREE LINE

Line side Tap are allowed on UL listed Solar ready MSP only, (with Square D Solar Ready MSP, we have to use "Current Limiters at the point of the line side tap in conjunction with the Square D tap kit (see attached spec sheets "Square D Solar Ready Tap Kit-CP Current limiting protectors")

PV breaker required to be at opposite end of busbar

Centerfed 120% allowed

Label Page
  • If project has an existing system both (E) and (N) systems should be shown on placard
  • Add installer info label
Custom Placards Required
1
Placards Notes

make sure 2017 NEC rapid shutdown labels are installed.

Non Standard Planset Requirements
Single Line Diagram
Non Standard Revision Requirements

REVISIONS: Please RED cloud and Delta any changes made to the plans and provide the revision letter of the changes made.

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Ground Mount Notes
  • Propose a raceway/enclosure for the PV conductors, OR provide a fence detail to guard the perimeter of the array. If the fence is metallic and is within 6 ft. of the PV array, bond the fence every 50 ft. and include details/notes on the specific equipment used to bond the fence. 
  • For ground mounted PV arrays or PV arrays on detached structures, in addition to the equipment grounding conductor run with the PV system conductors, a grounding conductor shall be provided from the PV array to a grounding electrode system established at that ground mount or detached structure.
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Henderson (NV) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.