State of Nevada - Manufactured Housing (NHD) (NV)

Nevada Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Electrical,Digital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2017
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
2
Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes
Wet Stamps Required
Digital Electrical,Digital Structural
Structural Calculations Required
Yes
Ee Stamp Notes

We need an electrical engineer's certification letter in addition to stamped plans stating the alteration to the electrical system will not have any negative effect on the home's systems.

Electrical engineer stamps should be on the EEL and on the single line (needs to be same person on the stamp for both)


[SEE FILES SECTION FOR EXAMPLE].

Stamp Location On Plans
Top Right
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
30
Snow Load Notes

Never less than 30

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

In addition to a structural engineer's letter and calcs, will need an electrical engineer's certification letter stating the alteration to the electrical system will not have any negative effect on the home's systems.

Engineers stamping plans to match stamped engineering letters.

Minimum Ground On Roof
#8

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

If installing panels on both the MH and a detached garage, the detached garage will need a set of plans showing only the panels being installed on it. This is because the garage is permitted through the local AHJ rather than the housing division and will be receiving a separate permit.


Plans must be Stamped and Digitally signed by both Electrical and Structural Engineers.

Electrical Diagram

Standard

Custom Placards Required
1

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the State of Nevada - Manufactured Housing (NHD) (NV) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.