City of Troy (NY)

New York Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Setback Enforced0

Codes

NEC Code Version
2023
Code List

2025 NEW YORK STATE BUILDING CODE

2025 NEW YORK STATE RESIDENTIAL CODE

2025 NEW YORK STATE FIRE CODE

2025 NEW YORK STATE ENERGY CONSERVATION CODE

2025 NEW YORK STATE EXISTING BUILDING CODE

2025 NEW YORK STATE FUEL GAS CODE

2025 NEW YORK STATE MECHANICAL CODE

2025 NEW YORK STATE PLUMBING CODE

2025 NEW YORK STATE ENERGY STANDARD FOR SITES AND BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS

2023 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
0
Setback Notes
Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category B

Snow Load
40
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim