Town of North Hempstead (NY)
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2025 NEW YORK STATE BUILDING CODE
2025 NEW YORK STATE RESIDENTIAL CODE
2025 NEW YORK STATE FIRE CODE
2025 NEW YORK STATE ENERGY CONSERVATION CODE
2025 NEW YORK STATE EXISTING BUILDING CODE
2025 NEW YORK STATE FUEL GAS CODE
2025 NEW YORK STATE MECHANICAL CODE
2025 NEW YORK STATE PLUMBING CODE
2025 NEW YORK STATE ENERGY STANDARD FOR SITES AND BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
MUST ADD THE FOLLOWING IN NOTES TO VENDOR IN THE STAMP TASK:
"Please provide a letter from N.Y.S. design professional of records, signed and sealed, that in addition to certifying that the proposed system complies with Sec.R324.4.1 and the sub-sections regarding structural requirements (roof load, windload, etc.) as per the 2025 NYS code, also certify that the additional load (imposed by the proposed system) can be supported by the existing roof structures."
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Meter Adapter,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- DESIGNER must upload the "UL Report-2024" for ECOFASTEN ROCKIT Designs to Lightspeed & CR Drive - See Files
- DESIGNER must upload the T.B.D for UNIRAC FLASHKIT PRO Designs to Lightspeed & CR Drive - See Files
- Designer must attach both UL1703 files after the datasheets (See Files)
- Site
- Attachment Detail
Ensure attachment equipment is UL 2703 compliant, as required by the NYS Residential Code
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim