Village of Flower Hill (NY)
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2025 NEW YORK STATE BUILDING CODE
2025 NEW YORK STATE RESIDENTIAL CODE
2025 NEW YORK STATE FIRE CODE
2025 NEW YORK STATE ENERGY CONSERVATION CODE
2025 NEW YORK STATE EXISTING BUILDING CODE
2025 NEW YORK STATE FUEL GAS CODE
2025 NEW YORK STATE MECHANICAL CODE
2025 NEW YORK STATE PLUMBING CODE
2025 NEW YORK STATE ENERGY STANDARD FOR SITES AND BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
2023 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- Other (See Submission Notes)
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
- Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- PV Breaker,Line Side Taps,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
- Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
- A color rendering of the panels on the roof is required
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim