City of Marysville (OH)
Codes
- NEC Code Version
- 2023
- Code List
2024 OHIO BUILDING CODE (2021 IBC)
2019 RESIDENTIAL CODE OF OHIO (2018 IRC)
2024 OHIO EXISTING BUILDING CODE (2021 IEBC)
2023 OHIO ELECTRIC CODE (2023 NFPA 70)
2021 INTERNATIONAL FIRE CODE (IFC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Shall be installed on the plane of the roof (flush mounted) or made part of the roof design and shall not extend above the ridgeline of the roof or extend beyond the existing roof width. In no instance shall the system extend greater than 18 inches from the roofs surface.
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Line Side Taps,Load Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Roof Plan Notes
All exposed conduits, plumbing lines and related appurtenances shall be painted a color that closely matches the roof materials.
- Electrical Diagram
Projects that have a SolarEdge inverter do NOT require a J-Box
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
Any portion of the structure shall not exceed a maximum of 6 feet in height. All conduits, plumbing lines and related appurtenances shall be located underground.