County of Portage (OH)
NEC Code Version2023
Wet Stamps RequiredDigital Structural,Digital Electrical
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2024 OHIO BUILDING CODE (2021 IBC)
2019 RESIDENTIAL CODE OF OHIO (2018 IRC)
2024 OHIO EXISTING BUILDING CODE (2021 IEBC)
2023 OHIO ELECTRIC CODE (2023 NFPA 70)
2021 INTERNATIONAL FIRE CODE (IFC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- Yes
- Wet Stamps Required
- Digital Structural,Digital Electrical
- Structural Calculations Required
- Yes
- Ee Stamp Notes
AHJ wants the stamps located in the top right w/ Ohio Seal, registration # and Signature. Please see snipped communication attached from AHJ
- Stamp Location On Plans
- Top Right
- Date On Stamps
- Date Plans are Stamped
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 90
- Snow Load
- 20
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
AHJ wants the stamps located in the top right w/ Ohio Seal, registration # and Signature. Please see snipped communication attached from AHJ
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim