Township of Gasper (Preble County) (OH)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2024 OHIO BUILDING CODE (2021 IBC)
2019 RESIDENTIAL CODE OF OHIO (2018 IRC)
2024 OHIO EXISTING BUILDING CODE (2021 IEBC)
2023 OHIO ELECTRIC CODE (2023 NFPA 70)
2021 INTERNATIONAL FIRE CODE (IFC)
- IEBC Accepted
- 1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes - Multiple Layer Shingle,Yes - Non-Truss
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Wind Speed
- 106
- Snow Load
- 19
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- No
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,Line Side Taps,PV Breaker,Meter Adapter
- Supply Tap Neutral Ground Bond Required
- 1
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
- BOS Restrictions
Standard
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard ESS requirements
- Separate ESS Disconnect Required
- No
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Standard
- Cover Page
Standard
- Site
Standard
- Roof Plan
Standard
- Attachment Detail
Standard
- Electrical Diagram
Standard
- Label Page
Standard
Ground mount
- Ground Mount Fencing Required
- No
- Ground Mount Notes
Provide footer and uplift information for the rack supporting the panels.
Provide structural connection details for the rack and the mounting of the panels.
Site Plan:
- Existing and proposed contours, at a minimum of two (2) foot intervals;
- Location, setbacks, exterior dimensions and square footage of all existing and proposed structures;
- Location and size of existing waterways, wetlands, 100 - year floodplains, sanitary sewers, storm sewers, drain tiles and water distribution systems;
- Location of any overhead or underground utilities and easements.
Setback:
- In residential zoning districts, systems shall not be located in any front yard.
- In all zoning districts, systems shall comply with the respective setback requirements, as measured from the property line to the closest edge of the system.
Lot coverage:
- The total solar panel surface area shall be included in the lot coverage calculations for the respective zoning district.
Height:
- The height shall not exceed the height limits for accessory structures in the respective zoning district, as measured from adjoining grade at base to the highest elevation of the equipment
- Setback Front Yard
- 10
- Setback Back Yard
- 5
- Setback Side Yard
- 5