City of Beaverton (OR)

Oregon Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Code List

2023 OREGON RESIDENTIAL SPECIALTY CODE

2022 OREGON STRUCTURAL SPECIALTY CODE

2022 OREGON MECHANICAL SPECIALTY CODE

2023 OREGON PLUMBING SPECIALTY CODE

2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE

2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE

2023 National Electrical Code

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
1
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

All solar roof planes MUST have 36โ€ pathways along 3 sides of the roof plane. Pathways cannot be over unsupported areas like overhangs and eaves. The following exceptions below allow us to avoid having 3 pathways on each plane:

  1. Total array area is not greater than 1,000 sqft and it has an intersecting adjacent roof plane free of solar panels. 1. If #1 applies AND total array area does not exceed 25% of total roof area, then one 12โ€ pathway is required along each side of the horizontal ridge. 2. If #1 applies AND the total array area exceeds 25% of total roof area, then one 12โ€ pathway is required song each side of the horizontal ridge AND one 36โ€ pathway from ridge to eave shall be provided.
  2. Pathways are not required on non-occupied accessory structures, provided that they are separated from occupied structures by not less than 60 inches or by a minimum two-hour fire-rated assembly. When using this exception, please include a dimension of the shortest distance between the array building and the nearest occupied structure.

Pathways are not allowed within 12" of low point valleys.

Additional information and examples of acceptable fire setbacks can be found in the files below.

Structural & loads

Wind Speed
97
Snow Load
25
Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes

* For Roof Mounts- See Prescriptive Path Checklist attached. If meeting PPC criteria, the a structural stamp will not be needed. If not used, SE will be required per AHJ

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Line Side Taps,Meter Adapter,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

* Module spec sheet should show UL listing * For Roof Mounts- See Prescriptive Path Checklist attached. If meeting PPC criteria, the a structural stamp will not be needed. If not used, SE will be required per AHJ

Attachment Detail

Max 4' attachment span per Oregon State code

Ground mount

Ground Mount Fencing Required
Mesh/Scrim