City of Independence (OR)
NEC Code Version2023
Wet Stamps RequiredDigital Structural
Fire Setback Enforced0
Codes
- NEC Code Version
- 2023
- Code List
2021 OREGON RESIDENTIAL SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
2019 OREGON STRUCTURAL SPECIALTY CODE
2019 OREGON FIRE CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2019 OREGON MECHANICAL SPECIALTY CODE
2011 OREGON REACH CODE
2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
2002 OREGON MANUFACTURED DWELLING AND PARK SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
- Structural required for manufactured homes
- Stamps on plans
- PE Letter
- Structural Calcs
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Attachment Detail
Attachment spacing shall not be greater than 24" when
- Snow load exceeds 36 PSF
- The home is located within wind exposure category B, and the wind speed exceeds 120 mph
- The home is located within wind exposure category C, and the wind speed exceeds 110 mph.
- Modules will be located within 3' of a roof edge, hip, eave, or ridge
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim