City of Klamath Falls (OR)
Codes
- NEC Code Version
- 2023
- Code List
2021 OREGON RESIDENTIAL SPECIALTY CODE 2019 OREGON STRUCTURAL SPECIALTY CODE 2019 OREGON MECHANICAL SPECIALTY CODE 2021 OREGON PLUMBING SPECIALTY CODE 2023 OREGON ELECTRICAL SPECIALTY CODE AMENDMENTS 2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE 2019 OREGON ZERO ENERGY READY COMMERCIAL CODE 2019 OREGON FIRE CODE 2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- Rough Inspection
- None
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Structural Calculations Required
- Yes - Attachment Spacing > 2ft
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 999
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Minimum Ground On Roof
- #10
Electrical
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Planset requirements for Roof mounted modules:
- Roof-mounted solar panels must be installed as flush to the roof as possible.
- Panels cannot extend higher than the roof peak height
- On flat roofs, panels may extend up to 3 feet above the roofline.
****Every Planset (on the attachment page) must include a side/profile drawing.
- See "Profile Height" in the Files for an example:
- Max Building Height: (from grade to peak)
- Max Panel Height: (highest vertical point the panels will reach)
- Height Difference: (building height minus the panel height, should be positive to show we will not install higher than the peak)
- This can be a list on the Site Plan page or it can be pointed out on the Site Plan.
Additional Requirements
- Note next to the panels on the Equipment List the colors/shade of the panels. For example: Modules are dark, black on black on black (the installer-MP-BBB-400)
- Additional permits required through County of Klamath (OR). Please see page for requirements.
- Site
Every Planset (on the attachment page) must include a side/profile drawing.
See "Profile example" in the Files for an example:
- Maximum building height (from ground to roof peak),
- Maximum panel height, and
- The height difference between the two.
- Roof Plan Notes
All Jobs [Panels won't exceed peak roof height]
- Label Page
Provide a placard image with no modules on the roof.
- Custom Placards Required
- 0
- Non Standard Planset Requirements
- Home Elevation
- Non Standard Revision Requirements
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim