City of Medford (OR)
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2022 OREGON STRUCTURAL SPECIALTY CODE
2023 OREGON RESIDENTIAL SPECIALTY CODE
2023 OREGON PLUMBING SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 1
- New Planset Required For Module Swap
- 1
Stamps
- Wet Stamps Required
- None
- Structural Calculations Required
- No
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 96
- Snow Load
- 36
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
If the project cannot meet all Oregon Prescriptive Pathway requirements we will need structural calculations and a PE Letter. If the project DOES meet the Prescriptive Pathway requirements, then no stamps/calcs/letter will be needed.
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
The initial plan set submitted to the AHJ should have no red clouding on it. All revisions to the plans after the initial submission may use red clouds.
- Attachment Detail
Attachment spacing to be 48 max.
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim