City of Ontario (OR)

Oregon Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
SolarAPP+ StatusNot accepted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2023 NATIONAL ELECTRICAL CODE

2023 OREGON RESIDENTIAL SPECIALTY CODE

2025 OREGON ELECTRICAL SPECIALTY CODE

2022 OREGON STRUCTURAL SPECIALTY CODE

2022 OREGON FIRE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Not accepted
Any SolarAPP+ Restrictions
0
How Many Plansets Required
2
Revision Required
1
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Access pathways need to be located over structurally supported area. Roof overhangs area typically not located on structurally supported areas. 3 sides of 3โ€™ of access around the solar panel system from the street or front side of the house. That includes the 3โ€™ on the sides and 18โ€ on each side of the ridge. Also if it is more than 150โ€™ in length it will need some mid access


we can no longer start the fire setbacks from the edge of the roof if there is an eave, but if there is no eave we are good to start at the edge. The City of Ontario is stating that the "eave is an unsupported area of the roof and cannot be used as a fire setback" so will have to start designing the fire setbacks from the support wall.

Structural & loads

Wind Speed
105
Wind Notes

Wind exposure category C

Snow Load
999
Snow Load Notes

Roof: 25 Ground: 36

Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,Meter Adapter,PV Breaker,Line Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

OR Prescriptive checklist required

Cover Page Notes

All Jobs [Ground snow load of 36 psf, Roof snow load of 25 psf. Wind speed: 105MPH. Wind Exposure Category C]

Attachment Detail

Attachments shall not be spaced greater than 24 inches (609.6 mm) on center in any direction where:

  • Ground snow loads exceed 36 psf (1.197 kN/m2).
  • Located within 3 feet (914 mm) of a roof edge, hip, eave, or ridge.
  • Located in wind Exposure Category B or greater, and the wind speed exceeds 120 mph.
  • Located in wind Exposure Category C or greater, and the wind speed exceeds 110 mph.
Custom Placards Required
0
Non Standard Revision Requirements

Prescriptive Rooftop Mounted Solar Installation Checklist needs to be filled out and uploaded along with plan completion

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Ontario (OR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.