County of Marion (OR)

Oregon Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code VersionN/A
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
N/A
Code List

2021 STATE OF OREGON RESIDENTIAL SPECIALTY CODE

2022 STATE OF OREGON STRUCTURAL SPECIALTY CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2019 STATE OF OREGON MECHANICAL SPECIALTY CODE

2021 STATE OF OREGON PLUMBING SPECIALTY CODE

2023 STATE OF OREGON ELECRTICAL SPECIALTY CODE

2023 NATIONAL ELECTRICAL CODE

2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
Other (See Submission Notes)
Revision Required
1
New Planset Required For Module Swap
1

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

All PV installs shall include a 36" wide pathway maintained along (3) sides of the solar roof. The bottom edge of a roof cannot be used as a pathway. ....Where the solar array area exceeds 25% of total roof area, one 36in pathway from ridge to eave must be provided...

Structural & loads

Wind Speed
100
Snow Load
25
Snow Load Notes

Ground snow load: 25 PSF

Reducible Snow Load Allowed
1
Max Attachment Spacing
48
Structural Notes
If the project meets the minimum requirements listed on the Oregon Prescriptive Solar Checklist, no stamps or structural documents will be required. If the project does not meet the minimum requirements listed on the Oregon Prescriptive Solar Checklist, we will NEED stamps and supporting structural documents for permit submission. Summary of checklist: Attachments must be spaced not greater than 48 inches (1219 mm) on center in any direction. Attachments shall be spaced not greater than 24 inches (609.6 mm) on center in any direction where: 1. Ground snow loads exceed 36 psf (1.197 kN/m2). 2. Located within 3 feet (914 mm) of a roof edge, hip, eave or ridge. 3. Located in wind Exposure Category B or greater and the wind speed exceeds 120 mph. 4. Located in wind Exposure Category C or greater and the wind speed exceeds 110 mph.
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Line Side Taps,Meter Adapter,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

AHJ Requirements - Structural

any manufactured homes(with2x2 truss), flat roof, tiled roofs, metal framing, or pole buildings we cannot apply prescriptively. These all require Structural Stamps, PE Letter, and Calcs



Please obtain the following when designing on any manufactured homes(with2x2 truss), flat roof, tiled roofs, metal framing, or pole buildings

-Stamps on plans

-PE Letter

-structural calcs

Site


Site Notes

All Jobs [All PV installs shall include a 36" wide pathway maintained along (3) sides of the solar roof. The bottom edge of a roof cannot be used as a pathway. .... Where the solar array area exceeds 25% of total roof area, one 36in pathway from ridge to eave must be provided...]

Attachment Detail

Attachments shall not be spaced greater than 24" where Ground Snow load exceed 36 psf, located within 3 feet of a roof edge, hip, eave or ridge. Located in wind Exposure Category B or greater and the wind speed exceeds 120 mph. Located in wind Exposure Category C or greater and the wind speed exceeds 110 mph.

Attachment Detail Notes

Roof Mount [The attachments shall be spaced not more than 24 inches on center in any direction where the attachments are located within 3 ft of a roof edge, hip, eave, or ridge.]

Custom Placards Required
0
Non Standard Revision Requirements


Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes


Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Marion (OR) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.