County of Yamhill (OR)
Codes
- NEC Code Version
- 2023
- Code List
2021 OREGON RESIDENTIAL SPECIALTY CODE
2019 OREGON STRUCTURAL SPECIALTY CODE
2019 OREGON MECHANICAL SPECIALTY CODE
2021 OREGON PLUMBING SPECIALTY CODE
2023 OREGON ELECTRICAL SPECIALTY CODE
2025 OREGON ENERGY EFFICIENCY SPECIALTY CODE
2019 OREGON ZERO ENERGY READY COMMERCIAL CODE
2019 OREGON FIRE CODE
2010 OREGON MANUFACTURED DWELLING INSTALLATION SPECIALTY CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 85
- Snow Load
- 999
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
Structural review only required when Prescriptive Path Checklist cannot be used. Ensure Checklist is included in plan set. (If Applicable - SE digital stamps on corresponding pages, PE Letter & Calcs.) Check for PPC before submitting for SE
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Attachment Detail
Attachments shall be spaced not greater than 24 inches (609.6 mm) on center in any direction where:
- Ground snow loads exceed 36 psf (1.197 kN/m2).
- Located within 3 feet (914 mm) of a roof edge, hip, eave or ridge.
- Located in wind Exposure Category B or greater and the wind speed exceeds 120 mph.
- Located in wind Exposure Category C or greater and the wind speed exceeds 110 mph.
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim
- Ground Mount Notes
GM site plans must include property lines, all existing buildings, and septic system location.